Skip to main content

Marjalizo

project timeline and locations map scaled
1 3 2

We collaborate with leading international architectural design experts, such as PININFARINA Architects, RAWA Arquitectura, Mallol Arquitectos, Dalab Arquitectos, CGO Arquitectos, and MUSA Arquitectos. In development and construction, we draw on the more than 40 years of experience of Grupo UDG and Constructora GICSA.

LUXURY AND BRANDED RESIDENCES

MARJALIZO develops luxury residential projects in the most privileged areas of Panama, integrating the global vision of iconic firms such as Pininfarina with the human approach and family values of Mallol Arquitectos.

DIECI

4
COMING SOON – 2029 Located in the cosmopolitan neighborhood of Costa del Este, DIECI Design by Pininfarina embodies a combination of high-end residential living with the vibrant pulse of urban life, offering an exclusive sanctuary of city living.

ÉLEVÉ

6

COMING SOON – 2030

Located in Panama’s most exclusive district, Élevé is a residential tower designed to elevate every detail of your life. A fusion of French sophistication and the vibrant charm of Panama’s tropical Pacific jewel. Live elegantly in a captivating universe of luxury, in the heart of the city.

SIGNATURE RESIDENCES

Signature projects that reflect a unique vision and style, backed by specialized international architectural firms such as DALAB Arquitectos and RAWA Arquitectura. Each development is a signature work designed to maximize your return on investment in Panama.

7

THE HUB

UNDER CONSTRUCTION – 2026

Located on 74th Street in San Francisco, THE HUB is a prominent real estate project designed for those who value exclusivity and seek the luxury of living in the heart of Panama City.

5

Passage

PRE-SALE – 2026Passage is an apartment project located on the Amador Causeway. It is characterized by incorporating natural elements into its design, creating shade and coolness in all areas.
1

ALIVE

COMING SOON – 2028 Located in San Francisco, Alive Art District is a real estate project designed for professionals, creatives, and art lovers who are looking for more than just a residence: an inspiring lifestyle.
Euforia Art Compressed

EUPHORIA

DELIVERY – 2029 Strategically located in front of Multiplaza, in Panama’s emerging Art District, Euphoria Art District brings together art, style, and city life in a setting designed for those looking to live and invest in Panama’s new cultural epicenter.

LIVING PROPTECH

Thanks to the success of LIVING 73, the first smart apartment building for investment and residential living in Panama City, achieving 100% sales in record time. It has inspired us to expand the LIVING brand to other locations in the city center and to continue the legacy of LIVING-style projects with the same passion.

First 100% SMART community

localizacion

SMART Location

crecimiento del dinero

SMART Investment

apartamentos

SMART Apartments

mascotas

SMART Pet lovers

wellness

SMART Wellness

7397222 leaf plant natural forest garden icon

SMART Green

2

BeLIVING

UNDER CONSTRUCTION – 2026Be LIVING is a 15-story tower that stands out as a symbol of modernity and style. With only 8 apartments per floor and an exclusive floor of 4 apartments, it offers you luxury and privacy.
9

KYTE

PRESALE – 2027 Located in the heart of Obarrio, on 56th Street, KYTE by Living is the residential project of the future, combining advanced technology and exceptional construction quality in one of the best locations in Panama City.
3

AWA

PRESALE – 2028AWA by LIVING is an innovative real estate proposal, a serene and captivating space in the heart of Panama City, distinguished by its excellent location in Bella Vista, on 42nd Street and Avenida Balboa.
8

CORE

COMING SOON – 2032CORE Living is a project designed in collaboration with architect Ricardo Arosemena and will be located in the iconic El Cangrejo area, known for its accessibility, green spaces, and vibrant commercial offerings.
369c4378 540f 4f0c ba34 5fedb8bc2b4c

Become an expert

Join our mission to make a difference. Collaborate with us in a strategic partnership on projects that generate a positive impact on the community and the world. We look forward to working with you.